Hydraulic Transient Study of Narragansett Bay Commission Tunnel System
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
Hydraulic Transient Study of Narragansett Bay Commission Tunnel System
Alternative title
Authors
Published Date
1995-08
Publisher
St. Anthony Falls Laboratory
Type
Report
Abstract
The purpose of this study is to evaluate the hydraulic transient status in the proposed Narragansett Bay Commission (NBC) Tunnel System in north central Rhode Island. The tunnel system is designed as an off-line storage facility. As shown in Fig. 1, the tunnel system consists of Main Spine Tunnel and Seekonk Tunnel, as well as 18 dropshafts. For a larger storm, the inflow must be controlled to prevent overfilling. At a circumstance of inflow control gate failure at some dropshafts, the flows exceeding the storage capacity of the tunnel may overflow into the Mosshasuck River through an "extreme event overflow". This structure is proposed to be located in the vicinity of OF 009/010.
Keywords
Description
Related to
Replaces
License
Collections
Series/Report Number
Project Report;368
Funding information
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Suggested citation
He, Jianming; Song, Charles C. S.; Liu, Ying. (1995). Hydraulic Transient Study of Narragansett Bay Commission Tunnel System. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/167314.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.