Compaction Remediation for Construction Sites

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Compaction Remediation for Construction Sites

Alternative title

Published Date

2008-01

Publisher

Minnesota Department of Transportation

Type

Report

Abstract

The goal of this project is to develop a sub-soiling regimen that will enhance and be compatible with existing erosion control measures. This project is important in minimizing the effect of construction-induced compaction on the urban and rural landscape. This activity, if successful, will become a building block for use in Best Management Practices (BMPs) that will ensure full vegetative growth post construction, and save on the cost of reapplication of erosion control measures. For a good comparative study, several sites were selected for typical slope and soil type. The study shows that there are low cost benefits to deep tillage of ROW. Heavy clay soils are problematic in that improvements in infiltration could not be detected after a single tillage operation. In lighter sandy soils, the benefits of tillage are such that significant increases in infiltration can be gained following a single pass tillage operation. The differences in tillage implement used could not be detected. The post-tillage aesthetic appeal when using a non-inverting plow (Kongskilde Paraplow) was apparent in this study. The vegetation was largely undisturbed following tillage, and this would be beneficial in preventing erosion on slopes. The ripper and the DMI inverted more soil, and therefore the tillage operation was less appealing to motorists. The relatively low cost of ownership and operation for the tillage is overshadowed by the high land cost when new roads are constructed. Tillage would be beneficial on lighter soils, however the "utility congestion" that is likely in such a scenario would make machinery management difficult.

Description

Related to

Replaces

License

Collections

Series/Report Number

Mn/DOT 2008-01

Funding information

Minnesota Department of Transportation

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Chaplin, Jonathan; Min, Min; Pulley, Reid. (2008). Compaction Remediation for Construction Sites. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/5607.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.