Future TMC Operations System Prototype and Testing Facility: Phase II

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Future TMC Operations System Prototype and Testing Facility: Phase II

Alternative title

Published Date

2005-03-01

Publisher

Type

Abstract

This report looks at how traffic control rooms are behind the curve of available technology. Mn/DOT realized a need to create TRAMLAB, in order to set up an environment which contains a virtual control room where technologies such as: surveillance, traffic control, incident detection, and management can be tested before implementation. The three objectives for this study are as follows: 1. Evaluate existing operations in the control room of the Mn/DOT TMC and make recommendations for increasing the efficiency of their operations. 2. Enhance TRAMLAB by enhancing the user interface and integrating it with a microscopic simulator. 3. Enhance the utilities of the simulator by adding features such as an automated initial state creator and a module for presenting the output of simulation. In spite of the completion of the TRAMLAB objectives, there is still room for further expansion and improvements. One example includes incorporation of algorithms for detecting the malfunctioning of field devices such as detectors. Another improvement would be to expand TRAMLAB for urban street actuated and adaptive control (as opposed to pre-timed only) incorporating actuated control interfaces as well as SCOOT and SCATS or other traffic -responsive schemes. Further, a web interface can be developed to provide the nonuniversity users with access to TRAMLAB.

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

Funding information

Guidestar
ITS Institute

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

CTS 04-06

Suggested citation

Michalopoulos, Panos; Hourdakis, John; Sinha, Prasoon. (2005). Future TMC Operations System Prototype and Testing Facility: Phase II. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/1217.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.