Evaluation of Retrofit Procedures for Nail-Laminated and Stringer Bridges
2002-03-01
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
Evaluation of Retrofit Procedures for Nail-Laminated and Stringer Bridges
Authors
Published Date
2002-03-01
Publisher
Type
Abstract
Many of the 1,400 timber bridges in Minnesota do not meet present day standards. Some of these bridges can be improved rather than replaced. When the desired service level can be attained by widening a bridge six feet or less, the bridge can be retrofitted by placing a second, wider, transverse deck onto the existing deck and substructure. Bridge components must be carefully inspected prior to a retrofit project. The retrofit of Bridge #6641 in Sibley County is a good example. First, the bituminous surface was removed. A longitudinal beam supported the extended deck. Grout was poured and leveled and then nail-laminated panels were laid transversely. A bituminous surface was laid over the full width of the new deck. The cost of the project was $51,632. (Replacing the bridge was estimated to take 2-3 years and cost $215,000.) The county quantified the strength change and load distribution characteristics by performing static and dynamic load tests before and after the retrofit. Adding a second deck effectively decreased the static deflections and improved the transverse load distribution. Nail-laminated timber bridge #2642, also in Sibley County, was retrofitted in 1992 and load-tested again in 1995. All dynamic deflections were lower than those of the post-retrofit tests in 1992. This improvement can be explained in part by the drying of the moisture that was introduced into the bridge deck during grouting. A retrofitted timber bridge is expected to last an additional 20-40 years.
Keywords
Description
Related to
Replaces
License
Collections
Series/Report Number
Funding information
Local Road Research Board
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Mn/DOT 2002-28
Suggested citation
Larson, Timothy D; Seavey, Robert. (2002). Evaluation of Retrofit Procedures for Nail-Laminated and Stringer Bridges. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/878.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.