Hydraulic Transient Analysis of Tarp Phase II System
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
Hydraulic Transient Analysis of Tarp Phase II System
Alternative title
Authors
Published Date
1988-09
Publisher
St. Anthony Falls Hydraulic Laboratory
Type
Report
Abstract
The O'Hare System of the Tunnel and Reservoir Plan (TARP), which
services 11.2 square miles of combined sewers, as shown in Fig. 1, is the
smallest of the four systems comprising the 352-square mile combined sewer
service area operated by the Metropolitan Sanitary District of Greater
Chicago (MSDGC). After completion of this system in 1980, the O'Hare
System area has still experienced problems, including basement flooding from
sewer back-up and foundation seepage, overbank flooding, transportation
delays caused by flooded streets, water quality degradation of area
watercourses from combined sewer overflow, and public health hazards
resulting from sewer back-ups. The average annual damage due to flooding
in the O'Hare System are estimated to be in excess of $2.5 million
Keywords
Description
Related to
Replaces
License
Collections
Series/Report Number
Project Report
276
276
Funding information
U.S. Army Corps of Engineers
Contract No. DACW25-88-M-4080
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Suggested citation
Guo, Qizhong; Song, Charles C. S.. (1988). Hydraulic Transient Analysis of Tarp Phase II System. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114109.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.