Determining Economic Strategies for Repair and Replacement of Low Slump Overlays of Bridge Decks

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Determining Economic Strategies for Repair and Replacement of Low Slump Overlays of Bridge Decks

Published Date

2007-05

Publisher

Minnesota Department of Transportation, Research Services Section

Type

Report

Abstract

In the interest of providing tools for the cost-effective maintenance of an aging inventory of bridges, a method for comparing feasible repair/replacement sequences for low-slump concrete overlays for bridge decks is developed. The method relies on a technique for computing deterioration curves using inspection data from the National Bridge Inventory. Over twenty years of inspection data for bridge decks in Minnesota, which were overlaid with low-slump concrete overlays placed between 1974 and 1981, was used. The deterioration curves were assumed dependent on several material and geometric variables identified by means of a literature review, and the statistical significance of these parameters on deterioration rates was examined. These variables include span length, average daily traffic, and superstructure material type, and piecewise linear deterioration curves were constructed for various subgroups with similar deterioration characteristics. Present value cost analysis was used to price the available options by identifying the sequence of repairs that has the least cost while maintaining a specified performance measure. The present value analysis considers the costs and timing of repair/replacement sequences, inflation, and the discount rate.

Description

Related to

Replaces

License

Collections

Series/Report Number

Funding information

Minnesota Department of Transportation

Isbn identifier

Doi identifier

Previously Published Citation

Suggested citation

Zimmerman, Justin; Olson, Steven; Schultz, Arturo. (2007). Determining Economic Strategies for Repair and Replacement of Low Slump Overlays of Bridge Decks. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/5572.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.