Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.
 

Monitoring and Analysis of Mn/DOT Precast Composite Slab Span System (PCSSS)

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Monitoring and Analysis of Mn/DOT Precast Composite Slab Span System (PCSSS)

Published Date

2008-09

Publisher

Minnesota Department of Transportation

Type

Report

Abstract

The Mn/DOT Precast Composite Slab Span System (PCSSS) was initially designed by Mn/DOT with input from the University of Minnesota researchers and local fabricators. The bridge system consisted of a series of precast prestressed concrete inverted tee bridge elements that also served as stay-in-place formwork for the cast-in-place (CIP) portion of the deck placed in the field. One of the Mn/DOT implementations, located in Center City, MN, was instrumented, and subsequently, monitored for 24 months to investigate reflective cracking and continuity over the piers since the deck was cast. The data obtained from the field study indicated that cracking had initiated in the bridge at the locations of some of the transverse gages in the CIP just above the longitudinal flange joint at midspan and some of the longitudinal gages near the support. The cracking was determined to be the result restrained shrinkage and environmental effects rather than due to vehicular loads. Transverse load distribution was evaluated with a static truck test. In addition, a two-span laboratory specimen was constructed and load tested to investigate effects of variations in flange thickness, bursting reinforcement, horizontal shear reinforcement, and flange surface treatment. The positive restraint moment that developed at the pier was also monitored for the first 250 days after continuity was made. The data from the laboratory and field tests were analyzed with respect to reflective cracking, transverse load distribution, pier continuity, bursting, and restraint moment, and design recommendations were made.

Description

Related to

Replaces

License

Collections

Series/Report Number

MnDOT
2008-41

Funding information

Minnesota Department of Transportation

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Smith, Matthew; Eriksson, Whitney; Shield, Carol; French, Catherine. (2008). Monitoring and Analysis of Mn/DOT Precast Composite Slab Span System (PCSSS). Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/151445.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.