Hydraulic Transient Study of Narragansett Bay Commission CSO Storage Tunnel

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Hydraulic Transient Study of Narragansett Bay Commission CSO Storage Tunnel

Published Date

1999-11

Publisher

St. Anthony Falls Laboratory

Type

Report

Abstract

One concern of the tunnel system is the potential for hydraulic transients during the tunnel filling process. Under some conditions, strong storm inflow to a tunnel may generate severe hydraulic surge in the tunnel, and consequently water may shoot up from the dropshaft like a geyser, which may result in structural damage to surface facilities and other environmental problems. For example, in Minneapolis, USA, a severe storm in 1997 caused a geyser 17 m above the ground from the storm water tunnel. The purpose of this study is to examine the possibility of any geysering and other hydraulic transient problems during the tunnel filling process based on the proposed tunnel configuration design and inflow under different tunnel operating conditions using our wellestablished hydraulic transient computer simulation model (MXTRANS).

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

Funding information

CH2M Hill

Isbn identifier

Doi identifier

Previously Published Citation

Suggested citation

He, Jianming; Song, Charles C. S.. (1999). Hydraulic Transient Study of Narragansett Bay Commission CSO Storage Tunnel. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/113144.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.