Benefit and Cost Analysis of the I-394 MnPASS Program
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
Benefit and Cost Analysis of the I-394 MnPASS Program
Published Date
2012-02
Publisher
Intelligent Transportation Systems Institute, Center for Transportation Studies, University of Minnesota
Type
Report
Abstract
In this report, we explored the benefits and costs associated with converting the I-394 High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes. The study focused on the I-394 corridor, with a 10-year
timeframe from 2006 to 2015. The benefits included travel time savings, safety benefits, and vehicle operating cost savings, and the costs consisted of capital costs and annual operating costs. Where applicable, the implementation of this study followed the benefit-cost analysis guidance of MnDOT.
This study considered the benefits of both travel time savings and travel time reliability and the valuations of travel time savings and reliability were derived from econometric models for individual drivers’ behavior. HOT lane users choose the lanes because of travel time savings and/or the reliability of the lanes whereas previous studies considered only travel time savings and exclusively relied on standardized economic value of travel time.
This study estimated safety benefits from crash reduction using the Empirical Bayes method. Previous studies scarcely considered the benefits resulting from the conversion of HOV lanes to HOT lanes. This study also showed that “naïve” approaches tended to overstate safety benefits, which highlighted the importance of using a sound methodology.
Description
Related to
Replaces
License
Collections
Series/Report Number
CTS 12-03
Funding information
Intelligent Transportation Systems Institute,
Center for Transportation Studies,
University of Minnesota
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Suggested citation
Cao, Xinyu (Jason); Munnich, Lee; Liu, Henry; He, Xiaozheng (Sean); Xu, Zhiyi; Huang, Yan (Arthur). (2012). Benefit and Cost Analysis of the I-394 MnPASS Program. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/120263.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.