Benefit and Cost Analysis of the I-394 MnPASS Program

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Benefit and Cost Analysis of the I-394 MnPASS Program

Published Date

2012-02

Publisher

Intelligent Transportation Systems Institute, Center for Transportation Studies, University of Minnesota

Type

Report

Abstract

In this report, we explored the benefits and costs associated with converting the I-394 High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes. The study focused on the I-394 corridor, with a 10-year timeframe from 2006 to 2015. The benefits included travel time savings, safety benefits, and vehicle operating cost savings, and the costs consisted of capital costs and annual operating costs. Where applicable, the implementation of this study followed the benefit-cost analysis guidance of MnDOT. This study considered the benefits of both travel time savings and travel time reliability and the valuations of travel time savings and reliability were derived from econometric models for individual drivers’ behavior. HOT lane users choose the lanes because of travel time savings and/or the reliability of the lanes whereas previous studies considered only travel time savings and exclusively relied on standardized economic value of travel time. This study estimated safety benefits from crash reduction using the Empirical Bayes method. Previous studies scarcely considered the benefits resulting from the conversion of HOV lanes to HOT lanes. This study also showed that “naïve” approaches tended to overstate safety benefits, which highlighted the importance of using a sound methodology.

Description

Related to

Replaces

License

Collections

Series/Report Number

Funding information

Intelligent Transportation Systems Institute, Center for Transportation Studies, University of Minnesota

Isbn identifier

Doi identifier

Previously Published Citation

Suggested citation

Cao, Xinyu (Jason); Munnich, Lee; Liu, Henry; He, Xiaozheng (Sean); Xu, Zhiyi; Huang, Yan (Arthur). (2012). Benefit and Cost Analysis of the I-394 MnPASS Program. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/120263.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.