Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for A Probabilistic Model for Failure of Polycrystaline Silicon MEMS Structures

Total visits

views
A Probabilistic Model for Failure of Polycrystaline Silicon MEMS Structures 157

Total visits per month

views
June 2024 0
July 2024 0
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
Zhu_umn_0130M_15917.pdf 246

Top country views

views
United States 69
China 34
Germany 6
Ireland 5
Hong Kong SAR China 3
Bangladesh 2
Algeria 2
France 2
Iran 2
Macau SAR China 2
Romania 2
Singapore 2
Australia 1
Canada 1
Czechia 1
Spain 1
Indonesia 1
India 1
South Korea 1
Lithuania 1
Mauritius 1
Malaysia 1
Nigeria 1
Peru 1
Philippines 1
Turkey 1
Taiwan 1
Tanzania 1

Top city views

views
Minneapolis 9
Beijing 8
Baltimore 7
Ann Arbor 5
Dublin 5
Ashburn 4
Hangzhou 4
Houston 4
Shanghai 4
Menlo Park 3
San Francisco 3
Buffalo 2
Changsha 2
Fremont 2
Los Angeles 2
Old Bridge 2
Singapore 2
Tianjin 2
Xi'an 2
Albuquerque 1
Alicante 1
Babati 1
Boardman 1
Béchar 1
Central 1
Changchun 1
Chennai 1
College Park 1
Columbia 1
Des Moines 1
Huntington Beach 1
Irvine 1
Istanbul 1
Las Vegas 1
Lebanon 1
Lima 1
Logan 1
Malden 1
Melbourne 1
Newark 1
Orlando 1
Prague 1
Rose Hill 1
San Antonio 1
Scarborough 1
Seattle 1
Sougueur 1
Springfield 1
Staten Island 1
Tokyo 1
Yancheng 1
Zhengzhou 1