Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Engineering an HIV-1 Vector to Express an Epitope-tagged Vif Protein

Total visits

views
Engineering an HIV-1 Vector to Express an Epitope-tagged Vif Protein 86

Total visits per month

views
June 2024 0
July 2024 0
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
UROP online poster.pdf 204

Top country views

views
United States 50
China 6
Germany 6
France 3
Canada 2
United Kingdom 2
Ireland 2
South Korea 2
Sweden 2
Singapore 2
Italy 1
Luxembourg 1
Netherlands 1

Top city views

views
Chicago 7
Ashburn 5
Palatine 5
Ann Arbor 4
Beijing 3
Elk Grove Village 3
Minneapolis 3
Dublin 2
Kingsbury 2
Singapore 2
Skokie 2
Bari 1
Cambridge 1
Cologne 1
Dallas 1
Dayton 1
Des Moines 1
Dunstable 1
Evanston 1
Fairhope 1
Fremont 1
Gothenburg 1
Lafayette 1
London 1
Notre Dame 1
Old Bridge 1
Poplar Grove 1
Redwood City 1
Saint-Quentin 1
Shenzhen 1
Staten Island 1
Stockholm 1
University Park 1
Wilmington 1
Winnipeg 1
Zhengzhou 1