Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Pumped Hydro Energy Storage (PHES) Using Abandoned Mine Pits on the Mesabi Iron Range of Minnesota – the Range of Opportunities and Issues

Total visits

views
Pumped Hydro Energy Storage (PHES) Using Abandoned Mine Pits on the Mesabi Iron Range of Minnesota – the Range of Opportunities and Issues 220

Total visits per month

views
June 2024 0
July 2024 0
August 2024 1
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
Fosnacht_PHES_Poster_E3_2011.pdf 130

Top country views

views
United States 66
China 62
France 18
Poland 11
Germany 9
Canada 6
United Kingdom 6
Switzerland 5
Philippines 5
Ireland 4
Singapore 3
Belgium 2
Italy 2
New Zealand 2
Portugal 2
Russia 2
Sweden 2
Spain 1
Indonesia 1
India 1
South Korea 1
Malaysia 1
Nepal 1
Thailand 1

Top city views

views
Beijing 18
Hangzhou 8
Ashburn 6
Gdynia 6
Minneapolis 6
Tianjin 6
Taiyuan 5
Claremore 4
Saint Paul 4
Warman 4
Zurich 4
Boardman 3
Dublin 3
Duluth 3
Pasig City 3
Singapore 3
Auckland 2
Buffalo 2
Hinckley 2
London 2
Newark 2
Xi'an 2
Ann Arbor 1
Arcueil 1
Bad Homburg 1
Bari 1
Bayan Lepas 1
Boydton 1
Brooklyn 1
Chicago 1
Crystal Lake 1
Des Moines 1
Dongguan 1
East Lansing 1
Ellicott City 1
Faribault 1
Fremont 1
Grand Rapids 1
Hibbing 1
Jakarta 1
Kaifeng 1
Karlsruhe 1
Kathmandu 1
Las Vegas 1
Loanhead 1
Los Angeles 1
Lyon 1
Mcallen 1
Mountain View 1
Munich 1
Nanjing 1
New Delhi 1
Old Bridge 1
Ottawa (Downtown) 1
Overland Park 1
Pasadena 1
Richmond 1
Saint Louis 1
Savage 1
Shanghai 1
Shenzhen 1
Southend 1
Staten Island 1
Stoney Creek 1
Xian 1
Zhengzhou 1