Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Mesh-independence and fast local convergence of a primal-dual active-set method for mixed control-state constrained elliptic control problems

Total visits

views
Mesh-independence and fast local convergence of a primal-dual active-set method for mixed control-state constrained elliptic control problems 66

Total visits per month

views
June 2024 0
July 2024 0
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
2095.pdf 133

Top country views

views
United States 36
China 6
Germany 6
France 5
Hong Kong SAR China 4
Canada 1
Côte d’Ivoire 1
Ireland 1
South Korea 1
Netherlands 1
Sweden 1
Singapore 1
Senegal 1

Top city views

views
Ashburn 24
Des Moines 3
Brooklyn 2
Zhengzhou 2
Abidjan 1
Cheyenne 1
Dakar 1
Dongguan 1
Dublin 1
Fremont 1
Montréal 1
Mountain View 1
Old Bridge 1
Singapore 1
Staten Island 1