Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Transport of Chloride through Silt Loam, Sandy Loam and Sandy Loam with Compost

Total visits

views
Transport of Chloride through Silt Loam, Sandy Loam and Sandy Loam with Compost 141

Total visits per month

views
July 2024 0
August 2024 0
September 2024 3
October 2024 1
November 2024 0
December 2024 0
January 2025 0

File Visits

views
pr590.pdf 537

Top country views

views
United States 112
China 8
Singapore 4
Finland 3
Ireland 3
South Korea 3
Romania 2
Australia 1
Germany 1
France 1
India 1

Top city views

views
Ashburn 17
Columbus 15
Minneapolis 10
Boardman 9
Des Moines 6
Waseca 5
Singapore 4
Valparaiso 4
Dublin 3
Beijing 2
Burnsville 2
Madison 2
Mountain View 2
Saint Paul 2
San Antonio 2
Brisbane 1
Eden Prairie 1
Grand Marais 1
Los Angeles 1
Mankato 1
Northport 1
Panjin 1
Poeni 1
River Falls 1
Roseau 1
Seoul 1
Shanghai 1
Shoreview 1
Stillwater 1
The Villages 1
Timișoara 1
Torrance 1
Ulju-gun 1
Wellesley Hills 1
Zhengzhou 1