Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Gain-Scheduled Linear Fractional Control for Active Flutter Suppression

Total visits

views
Gain-Scheduled Linear Fractional Control for Active Flutter Suppression 218

Total visits per month

views
June 2024 0
July 2024 0
August 2024 1
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
AIAA-4418-231.pdf 459

Top country views

views
United States 87
France 36
China 29
Germany 15
United Kingdom 5
Italy 4
Netherlands 4
Sweden 4
Finland 3
Argentina 2
Brazil 2
Canada 2
Switzerland 2
Hong Kong SAR China 2
Ireland 2
Romania 2
Sudan 2
Singapore 2
Australia 1
Belgium 1
Czechia 1
Iraq 1
Iran 1
South Korea 1
Norway 1
Russia 1
Senegal 1
Vietnam 1

Top city views

views
Ashburn 28
Beijing 13
Zhengzhou 7
Mountain View 6
Ann Arbor 4
Overland Park 4
Redmond 4
Southend 4
Des Moines 3
Fremont 3
Ludwigshafen am Rhein 3
Bad Homburg 2
Dublin 2
Pasadena 2
Shanghai 2
Staten Island 2
Tulsa 2
Anchorage 1
Baghdad 1
Braunschweig 1
Buffalo 1
Burke 1
Cheyenne 1
Chicago 1
Chisago City 1
Edmonton 1
Frankfurt am Main 1
Hamar 1
Kutna Hora 1
Kyoto 1
Laurel 1
Long Beach 1
Los Angeles 1
Melbourne 1
Minneapolis 1
Montréal 1
Newark 1
Old Bridge 1
Pacoima 1
Poços de Caldas 1
Rochester 1
San Francisco 1
Secaucus 1
Singapore 1
São José dos Campos 1
The Hague (Laak) 1
Ulu Bedok 1
Upplands Vasby 1
Valparaiso 1
Xiamen 1