Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Headrace Design Studies for the Jim Falls Hydro-Redevelopment Project

Total visits

views
Headrace Design Studies for the Jim Falls Hydro-Redevelopment Project 243

Total visits per month

views
June 2024 0
July 2024 0
August 2024 1
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
tp_213a.pdf 166

Top country views

views
China 68
United States 67
France 15
Germany 13
South Korea 7
Russia 7
Canada 6
Indonesia 5
Ireland 5
Netherlands 5
United Kingdom 4
India 4
Australia 3
Italy 3
Switzerland 2
Nepal 2
Philippines 2
Singapore 2
Argentina 1
Burundi 1
Dominican Republic 1
Egypt 1
Ethiopia 1
Hong Kong SAR China 1
Iran 1
Norway 1
New Zealand 1
Sweden 1
Turkey 1
Taiwan 1

Top city views

views
Shenzhen 51
Ashburn 11
Mountain View 10
Dublin 5
Minneapolis 5
Jakarta 4
Beijing 3
Boardman 3
Des Moines 3
Ann Arbor 2
Bad Homburg 2
Brisbane 2
Chicago 2
Delhi 2
Göttingen 2
Kathmandu 2
Manchester 2
Shanghai 2
Singapore 2
Tokyo 2
Anilao 1
Ankara 1
Auckland 1
Buffalo 1
Cairo 1
Clifton 1
Fort Huachuca 1
Fremont 1
Greenville 1
Grünheide 1
Harbin 1
Hilton Head Island 1
Hopkins 1
Jacksonville 1
Los Angeles 1
Montréal 1
Newark 1
Old Bridge 1
Overland Park 1
Pasadena 1
Patna 1
Phoenix 1
Saint-lambert 1
Santo Domingo Este 1
Scarborough 1
Seelow 1
Southend 1
Staten Island 1
Toronto 1
Trondheim 1
University Park 1
Vancouver 1
Winnipeg 1
Zhengzhou 1