Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Hydraulic Transient Study of Fall River Tunnel System

Total visits

views
Hydraulic Transient Study of Fall River Tunnel System 73

Total visits per month

views
June 2024 0
July 2024 1
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
pr365.pdf 29

Top country views

views
China 29
United States 26
South Korea 4
Brazil 3
Canada 3
Ireland 2
Australia 1
Indonesia 1
Iran 1
Lithuania 1
Singapore 1

Top city views

views
Beijing 7
Des Moines 5
Ashburn 3
Minneapolis 3
Ningbo 3
Oakville 3
Boardman 2
Dublin 2
Wuxi 2
Zhengzhou 2
Brooklyn 1
Capela do Alto 1
Chengdu 1
Chicago 1
Denver 1
Hopkins 1
Jakarta 1
Jeonju 1
Kaifeng 1
Merrylands 1
Redwood City 1
Rio De Janeiro 1
River Falls 1
Rongcheng 1
Seoul 1
Shenzhen 1
Singapore 1
Stillwater 1
São Paulo 1