Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for N-terminus (Y145STOP) fragment of the prion protein plays a role in prion misfolding

Total visits

views
N-terminus (Y145STOP) fragment of the prion protein plays a role in prion misfolding 391

Total visits per month

views
June 2024 0
July 2024 0
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
AbdAllah_umn_0130E_13110.pdf 540

Top country views

views
China 175
United States 82
France 42
Taiwan 15
Germany 11
Canada 8
United Kingdom 5
Ireland 4
India 4
Sweden 4
Spain 3
Hong Kong SAR China 3
Italy 3
Finland 2
South Korea 2
Norway 2
Philippines 2
Russia 2
Singapore 2
Senegal 2
Ukraine 2
Argentina 1
Brazil 1
Switzerland 1
Côte d’Ivoire 1
Estonia 1
Indonesia 1
Iran 1
Romania 1
Turkey 1

Top city views

views
Shenzhen 72
Beijing 13
Ashburn 9
Taipei 9
Redmond 7
Zhengzhou 6
Overland Park 5
Mountain View 4
Southend 4
Ann Arbor 3
Dublin 3
Hangzhou 3
Ludwigshafen am Rhein 3
Montréal 3
Seattle 3
Bad Homburg 2
Bolanos de Calatrava 2
Changsha 2
Chengdu 2
Chisago City 2
Fremont 2
Kolkata 2
Los Angeles 2
Pensacola 2
Rochester 2
Singapore 2
Tianjin 2
Tokyo 2
Toronto 2
Tulsa 2
University Park 2
Washington 2
Abidjan 1
Absecon 1
Anchorage 1
Andover 1
Baton Rouge 1
Bengaluru 1
Brooklyn 1
Central 1
Cheyenne 1
Cleveland 1
Columbus 1
Dakar 1
Des Moines 1
Escondido 1
Evanston 1
Fuzhou 1
Grand Rapids 1
Hamar 1
Jakarta 1
Limerick 1
London 1
Madrid 1
Makati 1
Minneapolis 1
Nanjing 1
Newark 1
Norwalk 1
Pacoima 1
Pasadena 1
Putian 1
Shanghai 1
Staten Island 1
Surrey 1
Tallinn 1
Upplands Vasby 1
Walnut 1
Wheat Ridge 1
Wilmington 1
Wuhan 1
Zhaoqing 1