Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for IRM Quarterly, Volume 32, Number 4 (Winter 2022-23). Cover article: Practical Magnetism X: A review of the low temperature AC susceptibility frequency-dependence of multidomain (titano)magnetite

Total visits

views
IRM Quarterly, Volume 32, Number 4 (Winter 2022-23). Cover article: Practical Magnetism X: A review of the low temperature AC susceptibility frequency-dependence of multidomain (titano)magnetite 53

Total visits per month

views
June 2024 0
July 2024 0
August 2024 1
September 2024 0
October 2024 0
November 2024 1
December 2024 0

File Visits

views
irmq32-4.pdf 162

Top country views

views
United States 29
China 8
South Korea 3
Brazil 2
Argentina 1
Germany 1
France 1
Sweden 1
Singapore 1
South Africa 1

Top city views

views
Farmington 5
Pacoima 3
Koto 2
Minneapolis 2
Mountain View 2
San Mateo 2
Andover 1
Beijing 1
Boydton 1
Columbus 1
Daegu 1
Des Moines 1
New York 1
Saint Paul 1
Seattle 1
Suwon 1
São Paulo 1
Tübingen 1