Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for Methane Sampling Technique and the Measurement of Plunge Pool Impact on Gas Transfer Rates at Low-Head Hydraulic Structures

Total visits

views
Methane Sampling Technique and the Measurement of Plunge Pool Impact on Gas Transfer Rates at Low-Head Hydraulic Structures 93

Total visits per month

views
June 2024 0
July 2024 0
August 2024 0
September 2024 0
October 2024 0
November 2024 0
December 2024 0

File Visits

views
pr389.pdf 424

Top country views

views
United States 45
China 11
Germany 8
France 8
Ireland 3
Canada 2
Finland 2
United Kingdom 2
Italy 2
Argentina 1
European Union 1
Hong Kong SAR China 1
India 1
Cambodia 1
South Korea 1
Malaysia 1
Singapore 1
Vietnam 1

Top city views

views
Ashburn 10
Shenzhen 5
Seattle 4
Minneapolis 3
Beijing 2
Boardman 2
Des Moines 2
Dublin 2
Los Angeles 2
Mountain View 2
Old Bridge 2
Bad Homburg 1
Brooklyn 1
Buffalo 1
Chantilly 1
Edmonton 1
Fremont 1
Hanoi 1
Hopkins 1
Huntington 1
Kansas City 1
Katy 1
London 1
Overland Park 1
Parma 1
Pasadena 1
Phnom Penh 1
San Jose 1
Singapore 1
Staten Island 1
Woodbridge 1