Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.

Statistics for The effect of dynamic operation and incoming flow on the wake of a utility-scale wind turbine

Total visits

views
The effect of dynamic operation and incoming flow on the wake of a utility-scale wind turbine 100

Total visits per month

views
June 2024 1
July 2024 0
August 2024 0
September 2024 2
October 2024 0
November 2024 2
December 2024 3

File Visits

views
Abraham_umn_0130E_22606.pdf 206

Top country views

views
United States 28
China 23
France 4
Hong Kong SAR China 4
Germany 3
India 3
Ireland 2
Malaysia 2
Poland 2
Singapore 2
Turkey 2
Brazil 1
Ecuador 1
United Kingdom 1
Indonesia 1
South Korea 1
Mongolia 1
Netherlands 1
Peru 1
Russia 1
Taiwan 1
Ukraine 1

Top city views

views
Ashburn 14
Tokyo 8
Beijing 6
Minneapolis 5
Hangzhou 3
Paris 3
Bytom 2
Changchun 2
Dublin 2
Istanbul 2
New York 2
Palakkad 2
Shenyang 2
Singapore 2
Zhengzhou 2
Bengaluru 1
Boardman 1
Buffalo 1
Chicago 1
Claremont 1
Des Moines 1
Dongguan 1
Harbin 1
Jakarta 1
Kowloon 1
Lima 1
Manta 1
Marialva 1
Marseille 1
Oxford 1
Seoul (Gongneung 2(i)-dong) 1
Taipei 1
Vladivostok 1
Wuhu 1