Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.
 

Hydraulic Transient Analysis of TARP Phase II O'Hare Tunnel System under Different Operating Plans

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Hydraulic Transient Analysis of TARP Phase II O'Hare Tunnel System under Different Operating Plans

Published Date

1997-10

Publisher

St. Anthony Falls Laboratory

Type

Report

Abstract

The 0' Hare System of the Tunnel and Reservoir Plan (T ARP), which serves 11.2 square miles of combined sewers, as shown in Fig. 1, is the smallest of the four systems comprising the 352-square mile combined sewer services area operated by the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC).

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

St. Anthony Falls Laboratory Project Reports
417

Funding information

U.S. Army Corps Of Engineers

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

He, Jianming; Charles C. S., Song. (1997). Hydraulic Transient Analysis of TARP Phase II O'Hare Tunnel System under Different Operating Plans. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/117626.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.