A Model Study of the Grit Chambers at the Minneapolis-St. Paul Sanitary District Plant.
1967-01
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
A Model Study of the Grit Chambers at the Minneapolis-St. Paul Sanitary District Plant.
Authors
Published Date
1967-01
Publisher
St. Anthony Falls Hydraulic Laboratory
Type
Report
Abstract
This report describes the results of model studies of the grit
chambers at the Minneapolis-St. Paul sewage treatment plant. The approach
sewer conducting the sewage to the grit chambers is a double barrel section
and is curved in plan. The sewer serves eight grit chambers by successive bifurcation of the original twin barrels as shown in the figure. Although the total flow is divided approximately
equally among the eight grit chambers. The overload in these chambers
is a oontributing cause to high cost of maintenance and lower efficiency.
Similar problems arise when less than eight chambers are operating.
Keywords
Description
Related to
Replaces
License
Collections
Series/Report Number
Funding information
Toltz, King, Duvall, And,erson and Associates, Inc. and Minneapolis-St. Paul Sanitary District
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Suggested citation
Silberman, E.; Paintal, A. S.. (1967). A Model Study of the Grit Chambers at the Minneapolis-St. Paul Sanitary District Plant.. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114200.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.