Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.
 

Hydropower potential at existing dams in the State of Minnesota

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Hydropower potential at existing dams in the State of Minnesota

Published Date

1983-06

Publisher

Type

Report

Abstract

The study identifies existing dam sites in the State of Minnesota which may be economically feasible for hydropower development. This is accomplished in a three step process. A first stage screening uses existing information on the 853 Minnesota dams and a rule-of-thumb criteria to eliminate sites with no hydropower feasibility from further investigation. A second stage screening improves the compiled information on the sites not eliminated in the first stage through site visits, contacts with government agencies, and contacts with dam owners. The final stage of the analysis is a pre-feasibility study on each of the dam sites not eliminated from consideration through the two screening processes. Guidelines for hydropower project cost estimates are developed and incorporated into a computer program which also uses hydrologic and hydraulic information and information on any existing hydroplant to determine the optimum plant capacity for economic return. The financial and economic feasibility criteria chosen are those typical of a municipality. The sites are ranked in order of economic return, based upon the· benefit-cost ratio after 35 years of operation. In addition, each site is given a qualitative ranking of very good, good, marginal or poor feasibility. The very good, good and marginal sites amount to 165.7 MW of additional undeveloped hydropower potential in the State of Minnesota. These sites may generate an additional 581 GWH of electricity per year. The total cost to develop these sites is estimated to be 255 million dollars (1982 base year).

Description

Related to

Replaces

License

Collections

Series/Report Number

Project Reports
223

Funding information

LEGISLATIVE COMMISSION ON MINNESOTA RESOURCES STATE OF MINNESOTA St. Paul, Minnesota

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Dotan, Avry; Gulliver, John S.. (1983). Hydropower potential at existing dams in the State of Minnesota. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/110079.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.