A Physical Model Study of the Main Interceptor Diversion Structure at the Expanded Metropolitan Wastewater Treatment Plant

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

A Physical Model Study of the Main Interceptor Diversion Structure at the Expanded Metropolitan Wastewater Treatment Plant

Alternative title

Published Date

1973-06

Publisher

St. Anthony Falls Hydraulic Laboratory

Type

Report

Abstract

Projections of the volume of sewage flow into the Metropolitan Wastewater Treatment Plant (Pig's Eye plant) serving the Minneapolis-St. Paul metropolitan area have compelled the Metropolitan Sewer Board to plan an expansion of the existing treatment facilities at Pig's Eye Island on the Mississippi River. A listing of selected anticipated flows is given in Table A-l of Appendix A. Under the title "Project 71" it is planned to increase the pretreatment and primary treatment capacity from an existing 260 MGD design capacity to 620 MGD, which corresponds to the present interceptor capacity. The increment of 360 MGD will be treated in new and separate facilities to be located to the east of the existing ones. To route part of the flow to the new facilities, a diversion (division) structure in the main interceptor just north of the existing plant is projected.

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

143

Funding information

Toltz, King, Duvall, Anderson and Associates, Inc.; Metropolitan Sewer Board

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Stefan, Heinz; Bancroft, Earl; Martin, Glenn. (1973). A Physical Model Study of the Main Interceptor Diversion Structure at the Expanded Metropolitan Wastewater Treatment Plant. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114853.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.