Between Dec 19, 2024 and Jan 2, 2025, datasets can be submitted to DRUM but will not be processed until after the break. Staff will not be available to answer email during this period, and will not be able to provide DOIs until after Jan 2. If you are in need of a DOI during this period, consider Dryad or OpenICPSR. Submission responses to the UDC may also be delayed during this time.
 

Kirtland’s Warbler on the Hiawatha National Forest: a spatial and temporal management problem

Loading...
Thumbnail Image

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Kirtland’s Warbler on the Hiawatha National Forest: a spatial and temporal management problem

Published Date

2013-06

Publisher

Type

Thesis or Dissertation

Abstract

The Kirtland's warbler (Setophaga kirtlandii) utilizes actively managed breeding habitat on the Hiawatha National Forest in Michigan's Upper Peninsula. Managing the spatial arrangement of future breeding habitat is a complex forest management problem. While it is relatively simple to identify good areas to create habitat in the near future, it is difficult to foresee, without analysis, whether good habitat patches and amounts can be maintained through a full forestry rotation. Additionally, financial investments required to create suitable habitat are substantial, and managers should carefully consider habitat designs that increase breeding success.A harvest scheduling model was applied on the Hiawatha National Forest to explore opportunities for habitat management. Results help support implementation of the 2006 Forest Management Plan, which identified goals and objectives to create and maintain 6700 acres of age 6-16 Kirtland's warbler (KW) habitat within a larger 33,500 acre KW habitat system. Applications addressed a mid-sized landscape (174,808 acres), comprised of 12,307 stands and a 60 year planning horizon, consisting of 30 two-year planning periods with KW habitat production objectives. Three major model explorations are documented. First, a heuristic is developed to solve an intractable dynamic programming (DP) problem. Secondly, a pre-processing heuristic is developed to pare down the number of stand-level management options that must be included in the harvest scheduling model. Finally, the modeling system is applied to the problem to identify a management strategy and show financial and spatial trade-offs of alternative management strategies. Results of the first exploration indicate that an optimal DP solution can be identified with the proposed heuristic with improved solution times. The second exploration shows substantial time savings from eliminating many KW management options without compromising solution value. The third exploration determines a management strategy for where and when to generate habitat on the Hiawatha National Forest along with the associated spatial and financial tradeoffs.

Keywords

Description

University of Minnesota Ph.D. dissertation. June 2013. Major: Natural Resources Science and Management. Advisor: Dr. Howard M. Hoganson. 1 computer file (PDF); v, 149 pages, appendices A-C.

Related to

Replaces

License

Collections

Series/Report Number

Funding information

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Henderson, Eric Brandt. (2013). Kirtland’s Warbler on the Hiawatha National Forest: a spatial and temporal management problem. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/155780.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.