Environmental Fatal Flaw Analysis for the Flat Hill I Wind Resource Area
2009-02-23
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
Environmental Fatal Flaw Analysis for the Flat Hill I Wind Resource Area
Alternative title
Authors
Published Date
2009-02-23
Publisher
Hubert H. Humphrey Institute of Public Affairs
Type
Thesis or Dissertation
Abstract
A Confidential Wind Developer (the “Developer”), is planning to develop a windpark in Clay County in
Minnesota. The proposed Flat Hill I Wind Resource Area (WRA) is located approximately 12 miles east
of the City of Moorhead. The project is in the initial development stage and many details of the project
design have not yet been determined.
The proposed Flat Hill I WRA is located on private land in in west-central Minnesota, east of the City of
Moorhead in Clay County (Figure 1 and Figure 2). Access to the Flat Hill I WRA is off State Route 9.
Numerous farmstead residences occur scattered through the study area. The nearest town to the study
area is Glyndon, Minnesota, located approximately five mile southwest of the Flat Hill I WRA. The
topography of the study area is level to gently rolling and consists of a large lake plain from Glacial Lake
Agassiz. The eastern portion of the Flat Hill I WRA includes Agassiz Beach Ridges topography with
noted elevation increases. Elevations range from approximately 910 to 1,117 feet above mean sea level.
Much of the study area is undeveloped and consists of agricultural areas. The Flat Hill I WRA borders
the Buffalo River State Park, southwest of the intersection of Minnesota Highway 10 and Highway 9
South.
Current plans for the project include the installation of 133, 1.5 MW GE turbines within the WRA. The
proposed Flat Hill I windpark will generate a maximum of 200 MW of total power. The Flat Hill I WRA
is within an irregularly-shaped area approximately nine miles by six miles, with a two mile by six mile
transmission corridor that extends to the south. Infrastructure to be installed in conjunction with proposed
turbine arrays includes access roads and underground and overhead electrical lines. Locations for any
other structures such as substations, switchyard and an operations and maintenance center have not been
identified.
Tetra Tech conducted a desktop study and preliminary field reconnaissance to identify key biological,
cultural, and land use issues associated with building and operating the proposed facility. Results of
background research and a preliminary field visit are summarized in this report. Additional investigations
that may help to address the potential effects of the project are presented for consideration.
Keywords
Description
professional paper for the Master of Urban and Regional Planning Degree
Related to
Replaces
License
Collections
Series/Report Number
Funding information
Isbn identifier
Doi identifier
Previously Published Citation
Flannery, Sean. (2009). Environmental Fatal Flaw Analysis for the Flat Hill I Wind Resource Area. Hubert H. Humphrey Institute of Public Affairs. Professional Paper.
Other identifiers
Suggested citation
Flannery, Sean. (2009). Environmental Fatal Flaw Analysis for the Flat Hill I Wind Resource Area. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/47846.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.