Abstract

A preliminary estimate of hydropower production feasibility was made for twenty-one existing dam sites in the State of Minnesota. The purpose of the preliminary analysis was to determine whether a comprehensive feasibility study is justified for the site. The expected annual energy production and initial project cost were estimated for each site. Initial cost estimates include turbine, generator, transmission line, and other electromechanical features as well as the civil features of hydropower retrofitting. Initial cost does not include dam rehabilitation, since the required information is not available for 19 of the 21 sites. The "relative cost" of the project was defined as the initial cost divided by the annual energy production, and was calculated for each site. The relative cost and general curves for payback period were used to estimate hydropower feasibility at each site. The results of the preliminary analysis are: 5 sites have good or very good hydropower feasibility, 6 sites are marginal, and 10 sites have poor hydropower feasibility. Estimates of the cost of a comprehensive feasibility study are included for each site.

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

Saint Anthony Falls Laboratory Project Reports
196

Funding information

Minnesota Energy Agency State Of Minnesota

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Gulliver, John S.; Garver, Rodrick J.; Arndt, Roger E. A.; Bowers, C. Edward. (1980). Preliminary Analysis Of Hydropower Production Feasibility At Twenty-One Existing Dam Sites In The State Of Minnesota. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/117305.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.