Abstract

There were two main goals to the second test; to determine the long tenn operability of balling circuits using quicklime and to produce green balls equal in quality to those produced using bentonite without allowing the mixed material to sit before balling. Modifications were made to the 03-4 circuit after the May test in order to achieve both of the above and this test was run from November 8 through November 12, 1994. A summary of the results is given below: The test was a success for two reasons. The 03-4 circuit ran smoothly for 4 days using quicklime instead ofbentonite. -.And, because the circuit ran smoothly, a lot of useful and meaningful data was collected and evaluated. The test was completed safely. There were no incidents or accidents reported during the preparation for or during the test. Levels of ammonia and fugitive dust were monitored during the test and found to be lower than during the May test. The levels detected in both tests were well below MSHA requirements. The green ball quality achieved during this test was higher than that achieved during the May test but below desired levels. However, this test, the May test and pilot plant tests all indicate that acceptable quality green balls can be produced using quicklime under the right conditions. Good quality green balls were produced during the May test when the mixed materials were allowed to sit after being mixed, during pilot plant tests when the materials were mixed for 1 minute and during this test when the mixing time exceeded 110 seconds. There were no unloading or handling problems during the test despite the fact that the pulverized quicklime was contaminated with pebble sized chunks. The supplier, Marblehead Lime Company, indicated that the chunks represented contamination from loading bins at their plant. The fired pellet quality on the entire line dropped during both tests despite the fact that quicklime was being used on only one of the four circuits on the line. This appears to be indirectly related to the use of quicklime. It appeared that, during the tests, quicklime reacted with the water in the bentonite and negatively affected the water absorbing properties of the bentonite. The circuits using the contaminated bentonite then produced poorer quality green balls than the circuit using quicklime. The slightly lower quality green balls produced using quicklime combined with the significantly lower quality green balls made with contaminated bentonite and resulted in lower quality fired pellets. This was suspected in the May test and verified during this test.

Description

Plant Demonstration Test at Minntac Using Pebble Lime, Coleraine Minerals Research Laboratory, Natural Resources Research Institute, University of Minnesota Duluth

Related to

Replaces

License

Series/Report Number

NRRI Technical Report;CMRL/TR-95-19

Funding information

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Goetzman, Harold E; Bleifuss, Rodney L. (1995). Second Quicklime Test 03-4 Balling Circuit November 1994. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/200931.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.