STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING
1965-05
Loading...
View/Download File
Persistent link to this item
Statistics
View StatisticsJournal Title
Journal ISSN
Volume Title
Title
STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING
Alternative title
Authors
Published Date
1965-05
Publisher
ST. ANTHONY FALLS HYDRAULIC LABORATORY
Type
Report
Abstract
This report describes the results of model studies of the Interstate-29
bridge crossing of the Big Sioux River near Sioux City, Iowa. These studies
were concerned with the testing of the provisions for protection of the bridges
from seoul:' during future floods and the stabilization of the banks from further
subsidence. Interstate-29 crosses the Big Sioux River about 1..5 miles above
the confluence of the Big Sioux with the Missouri River.
Keywords
Description
Related to
Replaces
License
Collections
Series/Report Number
78
78
78
Funding information
South Dakota Department of Highways, Iowa State Highway Commission
Isbn identifier
Doi identifier
Previously Published Citation
Other identifiers
Suggested citation
Anderson, Alvin G.. (1965). STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114102.
Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.