STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING

Alternative title

Published Date

1965-05

Publisher

ST. ANTHONY FALLS HYDRAULIC LABORATORY

Type

Report

Abstract

This report describes the results of model studies of the Interstate-29 bridge crossing of the Big Sioux River near Sioux City, Iowa. These studies were concerned with the testing of the provisions for protection of the bridges from seoul:' during future floods and the stabilization of the banks from further subsidence. Interstate-29 crosses the Big Sioux River about 1..5 miles above the confluence of the Big Sioux with the Missouri River.

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

78
78

Funding information

South Dakota Department of Highways, Iowa State Highway Commission

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Anderson, Alvin G.. (1965). STUDIES OF THE STABILIZATION OF THE BIG SIOUX RIVER AT THE INTERSTATE 29 BRIDGE CROSSING. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114102.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.