Hydraulic Model Tests for Mayfield Power Plant

Loading...
Thumbnail Image

View/Download File

Persistent link to this item

Statistics
View Statistics

Journal Title

Journal ISSN

Volume Title

Title

Hydraulic Model Tests for Mayfield Power Plant

Published Date

1974-04

Publisher

St. Anthony Falls Hydraulic Laboratory

Type

Report

Abstract

This report describes the results of the hydraulic model tests for the forebay structure of the Mayfield hydroelectric power plant conducted at the St. Anthony Falls Hydraulic Laboratory during the period May 1973 through March 1974. There are three existing power generating units, each of which is fed by an 18-ft-diameter penstock. Provisions have been made for an additional unit to be installed in the near future. Water is taken from Mayfield Lake, conveyed through a 37-ft-diameter tunnel, and discharged into a forebay. There are four intake structures, one for each penstock, at the downstream end of the forebay. Presently, the operation is hampered at high loading conditions. It is generally believed that unstable hydraulic conditions in the forebay are the cause of the present poor operating conditions. Strong vortices at the intakes have been observed in the field. The flow in the forebay is rough and turbulent. There are large shock waves at the pier noses, causing the water surface to fluctuate and become higher at units 42 and 43 and lower at unit 44. It is planned to add the fourth unit in the immediate future. Because an additional unit would mean an increased flow requirement, it is probable that the problems stated above would worsen. For this reason, a model study has been conducted to assess the problems for the expanded operation and find means of alleviating them. A 1:36 scale model was constructed and tested. After calibration, the model satisfactorily reproduced the existing flow conditions. The model indicated an increase in flow distortion and in water surface instability for the planned expansion. Air-entraining vortices were observed for all flows tested without modification of the existing facilities. On the basis of the experiments with various alternatives, the following schemes are recommended to provide good flow conditions: (a) two 18-ft-wide submerged guide vanes to be installed near the tunnel portal to redistribute the flow and improve the water surface profile and (b) a V-shaped vortex suppressor to be installed at each intake bay to eliminate the air-entraining vortices. A documentary motion picture showing the highlights of the model tests has been made as part of this test program.

Keywords

Description

Related to

Replaces

License

Collections

Series/Report Number

148

Funding information

Department of Public Utilities - City of Tacoma, Washington; Harza Engineering Company

Isbn identifier

Doi identifier

Previously Published Citation

Other identifiers

Suggested citation

Song, Charles. (1974). Hydraulic Model Tests for Mayfield Power Plant. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/114859.

Content distributed via the University Digital Conservancy may be subject to additional license and use restrictions applied by the depositor. By using these files, users agree to the Terms of Use. Materials in the UDC may contain content that is disturbing and/or harmful. For more information, please see our statement on harmful content in digital repositories.