Browsing by Author "Lampe, Joseph"
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Item Exploring the Walking Tolerance of Transitway Users(Minnesota Department of Transportation, 2017-09) Cao, Jason; Lampe, Joseph; Zhang, ChenTo park or to develop is always a key question for transit station area planning. Planners are interested in a hybrid option: siting park-and- ride (P&R) facilities at the periphery of development around transitway stations. However, the literature offers little evidence on how far a P&R lot can be located from transitways while maximizing ridership and revenue. Using a stated preference survey of 568 P&R users in the Twin Cities, this study conducted several experiments to illustrate their walking tolerance and identify built environment attributes that influence the walking distance. Walking distance is much more important than intersection safety, pedestrian infrastructure, and building appearance in affecting P&R users’ choice. The average walking distance is three city blocks when the minimum walking distance is set as two blocks in the experiments. Intersection safety, pedestrian infrastructure, and building appearance help mitigate the disutility of walking distance. If all three characteristics are adequate, it seems that P&R users are willing to walk 1.8 blocks farther than their existing facilities. A further analysis shows that the effects of these four dimensions vary by transit type. The analysis of stated importance illustrates that when determining how far P&R users are willing to walk, they value snow clearance, street lighting, and intersection safety the most. In general, the quality of sidewalk network connecting transit stops and P&R facilities is the most important, followed by safety and security attributes associated with the walking environment. However, the aesthetic quality seems to be the least important for P&R users.Item Shared-Use Mobility Possibilities in Brooklyn Park: Public Data(Resilient Communities Project (RCP), University of Minnesota, 2016) Hayford Oleary, Sean; Lampe, Joseph; Osendorf, Tara; Wardoku, Maria; Bai, Shunhua; Howard, KurtThis project was completed as part of the 2016-2017 Resilient Communities Project (rcp.umn.edu) partnership with the City of Brooklyn Park. The Blue Line Light Rail extension is expected to reach Brooklyn Park by 2021. Brooklyn Park wanted to investigate shared-use mobility as a means of expanding access to light rail for those without regular access to a personal automobile. The goal of this project was to determine current public transit usage, potential bicycle and pedestrian routes, and access to credit cards and smart phones, both of which are necessary to use many shared-use mobility options. Brooklyn Park project lead Emily Carr worked with a team of students in PA 5232/CEGE 5212: Transportation Policy, Planning, and Development, who developed an interactive website, report, and presentation for Brooklyn Park outlining current conditions in the city. The students' final report and presentation are available.